Project
5

RAPID PACKAGE 1_ EPCC OF RFCC, LTU, PRU UNITS
5

RAPID PACKAGE 28B_ EPCC OF THE EURO5 MOGAS CNHT2, ISOMERIZATION, TAME AND TANKAGE FOR RAPID PROJECT
3

RAPID PACKAGE 33_ EPCC OF RAPID EXCESS LOW PRESSURE (LP) STEAM TURBINE GENERATOR
5

EPCC FOR LNG TRUCK LOADING FACILITIES AT REGASIFICATION TERMINAL PENGERANG
7

New Air Compressor Project (NAP) at Gas Processing Santong (GPS), Paka
7

BEPCC for New Auxillary Boiler at Petronas Chemicals Methanol Labuan Sdn Bhd
5

P14 - Utilities, Interconnecting, Offsite (UIO) Facilities_ Construction and Commissioning (CC) of Fiber Optic Installation, Termination and Testing (Telecom Integration)
4

P14 -0900 Utilities, Interconnecting, Offsite (UIO) Facilities_ Construction and Commissioning (CC) for Main Control Building (MCB) - Field Auxiliary Room (FAR) Equipment Installation
5

Engineering, Procurement, Construction and Commissioning (EPCC) of MLNG New Boiler Project
4

Terengganu Gas Terminal (TGAST)
5

Package 7- Polyproylene Engineering, Procurement, Construction and Commissioning of Temporary Common Camp Facilities and Infrastructure
4

Package 29 K001 - EPCC of Temporary Construction Facilities C4 Ina Petrochemical Project